Services
MV Switchgear Testing
We verify both the physical condition and the switching and protection behavior of MV equipment after maintenance or before commissioning.

Service scope
MV Switchgear Testing
Insulation, contact resistance, breaker timing and protection function tests.
We verify both the physical condition and the switching and protection behavior of MV equipment after maintenance or before commissioning.
- Insulation resistance measurement
- Contact resistance measurement
- Breaker opening and closing time
- Relay secondary injection
- Primary injection when suitable
- Control, earthing and phase checks
Our process01 02 03




