Site-specific service plan
At machinery and production facilities, load variation and commissioning history guide the choice of transformer and switchgear tests.
The work scope is based on transformer type, switchgear, protection equipment and operating conditions. Prior test and event records are compared with new findings where available.
- Physical and connection checks
- Insulation and turns-ratio tests
- Winding and tap measurements
- Oil tests where applicable
- MV switchgear and protection checks
- Technical findings report




